{"id":60086,"date":"2026-04-22T09:48:41","date_gmt":"2026-04-22T07:48:41","guid":{"rendered":"https:\/\/www.itaf.eu\/?p=60086"},"modified":"2026-04-22T09:48:41","modified_gmt":"2026-04-22T07:48:41","slug":"office-relocation-it-checklist-teardown-and-rebuild-of-server-and-network-in-belgium","status":"publish","type":"post","link":"https:\/\/www.itaf.eu\/en\/office-relocation-it-checklist-teardown-and-rebuild-of-server-and-network-in-belgium\/","title":{"rendered":"Office relocation IT checklist: teardown and rebuild of server and network in Belgium"},"content":{"rendered":"<p><span data-contrast=\"none\">An office IT relocation is the controlled dismantling, transport and rebuild of a company&#8217;s complete IT infrastructure during a move. This includes servers, network equipment, cabling, firewall and telephony. Unlike moving furniture, an IT relocation carries specific risks: servers that are not properly shut down before transport can suffer data damage, and internet connections in Belgium (Proximus, Telenet) require a lead time of 4 to 8 weeks. For SMBs in Flanders and the Brussels periphery, a poorly planned IT move is one of the most common causes of unplanned downtime. A structured approach, starting at least 8 weeks in advance, prevents the majority of these risks.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">&nbsp;<\/span><\/p>\n<p><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/p>\n<h3><span data-contrast=\"none\">What do companies most often forget during an office move?<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:281,&quot;335559739&quot;:281}\">&nbsp;<\/span><\/h3>\n<p><span data-contrast=\"none\">An office move is one of the most underestimated IT risks for an SMB. While management is busy with lease agreements, removal companies and new furniture, IT infrastructure requires careful dismantling, safe transport and expert rebuilding. One wrong step can lead to days of downtime, data loss or a network that simply does not work at the new location.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">&nbsp;<\/span><\/p>\n<p><span data-contrast=\"none\">Based on practical experience supporting relocations across Flanders and the Brussels periphery, these are the most common oversights:<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">&nbsp;<\/span><\/p>\n<ul>\n<li><span data-contrast=\"none\">Internet connection at the new location not ordered in time- Proximus or Telenet lead time is 4 to 8 weeks<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/li>\n<li><span data-contrast=\"none\">No documentation of network cables and connections before dismantling, turning the rebuild into guesswork<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/li>\n<li><span data-contrast=\"none\">Servers not properly shut down before transport, resulting in data damage<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/li>\n<li><span data-contrast=\"none\">Telephone numbers (VoIP or ISDN) not ported to the new location<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/li>\n<li><span data-contrast=\"none\">Lead times for new network connections or additional power circuits in the server room not accounted for<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/li>\n<li><span data-contrast=\"none\">Employees not informed about the temporary impact on their working environment<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/li>\n<\/ul>\n<p><span data-contrast=\"none\">A good IT partner plans the relocation at least 8 weeks in advance and coordinates all technical aspects so the business can focus on everything else.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">&nbsp;<\/span><\/p>\n<p><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/p>\n<h3><span data-contrast=\"none\">What are the three phases of a professional IT relocation?<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:281,&quot;335559739&quot;:281}\">&nbsp;<\/span><\/h3>\n<p><span data-contrast=\"none\">An IT relocation consists of three sequential phases: teardown, transport and rebuild. Each phase carries its own risks and requires specific expertise.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">&nbsp;<\/span><\/p>\n<p>&nbsp;<\/p>\n<p aria-level=\"4\"><strong><i>Phase 1- What does a professional teardown involve?<\/i>&nbsp;<\/strong><\/p>\n<p><span data-contrast=\"none\">A teardown is the structured dismantling of all IT infrastructure before a move. Dismantling is more than pulling out cables. A professional teardown includes:<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">&nbsp;<\/span><\/p>\n<ul>\n<li><span data-contrast=\"none\">Complete documentation of the existing <a href=\"https:\/\/www.itaf.eu\/en\/services\/connectivity-solutions\/\" target=\"_blank\" rel=\"noopener\">network<\/a> before dismantling: patch panel mapping, IP schema, VLAN configurations, switch and router settings<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/li>\n<li><span data-contrast=\"none\">Controlled shutdown of all servers and active network equipment<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/li>\n<li><span data-contrast=\"none\">Labelling of all cables, components and rack equipment<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/li>\n<li><span data-contrast=\"none\">Packaging of servers and active equipment in anti-static and shock-absorbing materials<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/li>\n<li><span data-contrast=\"none\">Documentation of cable routing for reference during the rebuild<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/li>\n<\/ul>\n<p><span data-contrast=\"none\">Documentation at this stage is critical. Without it, the rebuild at the new location becomes a guessing exercise- and guessing with live infrastructure leads to downtime.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">&nbsp;<\/span><\/p>\n<p>&nbsp;<\/p>\n<p aria-level=\"4\"><strong><i>Phase 2- How should IT equipment be transported during an office move?<\/i>&nbsp;<\/strong><\/p>\n<p><span data-contrast=\"none\">IT transport is the physical movement of servers and active network equipment under controlled conditions. Servers and active network equipment are sensitive to shocks, moisture and static electricity. This is why IT equipment should never be entrusted to a standard removal company without specific IT experience.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">&nbsp;<\/span><\/p>\n<p><span data-contrast=\"none\">ITAF accompanies the transport or arranges specialist IT transport where needed. The distinction matters: a standard removal company is optimised for speed and volume. IT transport is optimised for protection and traceability.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">&nbsp;<\/span><\/p>\n<p>&nbsp;<\/p>\n<p aria-level=\"4\"><strong><i>Phase 3- What does the rebuild at the new location involve?<\/i>&nbsp;<\/strong><\/p>\n<p><span data-contrast=\"none\">The rebuild is the reassembly and full validation of all IT systems at the new location. It is the most technically intensive phase and the one where preparation from phases 1 and 2 pays off directly.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">&nbsp;<\/span><\/p>\n<p><span data-contrast=\"none\">The rebuild at the new location includes:<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">&nbsp;<\/span><\/p>\n<ul>\n<li><span data-contrast=\"none\">Assembly of the server rack and installation of all components<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/li>\n<li><span data-contrast=\"none\">Network cabling: patch panels, switches, access points<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/li>\n<li><span data-contrast=\"none\">Connection to the new internet line and firewall configuration<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/li>\n<li><span data-contrast=\"none\">Testing all systems before employees arrive<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/li>\n<li><span data-contrast=\"none\">Porting <a href=\"https:\/\/www.itaf.eu\/en\/services\/unified-communications\/\" target=\"_blank\" rel=\"noopener\">VoIP telephony<\/a> to the new location<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/li>\n<li><span data-contrast=\"none\">Validation of backup systems at the new location<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/li>\n<\/ul>\n<p><span data-contrast=\"none\">The goal of the rebuild is not just to restore what existed at the old location- it is to validate that everything works correctly in the new environment, before staff arrive on their first working day.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">&nbsp;<\/span><\/p>\n<p><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/p>\n<h3><span data-contrast=\"none\">What does a complete IT relocation checklist look like?<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:281,&quot;335559739&quot;:281}\">&nbsp;<\/span><\/h3>\n<p><span data-contrast=\"none\">The checklist below covers all 30 tasks across five time windows: 8 weeks before, 4 weeks before, 1 week before, on moving day, and after the move.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">&nbsp;<\/span><\/p>\n<p>&nbsp;<\/p>\n<p aria-level=\"4\"><strong><i>8 weeks before the move<\/i>&nbsp;<\/strong><\/p>\n<ul>\n<li><span data-contrast=\"none\">Order the internet connection at the new location (Proximus, Telenet or alternative provider)<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/li>\n<li><span data-contrast=\"none\">Check the electrical installation at the new location: sufficient earthed sockets, separate circuits for the server room, UPS connection point<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/li>\n<li><span data-contrast=\"none\">Assess the server room at the new location: cooling capacity, physical security, access control<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/li>\n<li><span data-contrast=\"none\">Draft the migration plan and communicate it to all employees<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p aria-level=\"4\"><strong><i>4 weeks before the move<\/i>&nbsp;<\/strong><\/p>\n<ul>\n<li><span data-contrast=\"none\">Full documentation of the existing network and server infrastructure<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/li>\n<li><span data-contrast=\"none\">Overview of all active internet contracts, telephone lines and VoIP numbers<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/li>\n<li><span data-contrast=\"none\">Order any new hardware required at the new location (switches, access points, cabling)<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/li>\n<li><span data-contrast=\"none\">Check all backups and perform a test restoration to validate recoverability<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/li>\n<li><span data-contrast=\"none\">Notify Microsoft (tenant settings), cloud providers and software vendors of the address change<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p aria-level=\"4\"><strong><i>1 week before the move<\/i>&nbsp;<\/strong><\/p>\n<ul>\n<li><span data-contrast=\"none\">Final alignment with the IT team and removal company on timing and task division<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/li>\n<li><span data-contrast=\"none\">Procurement of packaging materials: anti-static bags, foam padding, labels<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/li>\n<li><span data-contrast=\"none\">Full backup of all servers immediately before dismantling begins<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/li>\n<li><span data-contrast=\"none\">Communication to employees about expected downtime and remote work arrangements<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p aria-level=\"4\"><strong><i>On moving day<\/i>&nbsp;<\/strong><\/p>\n<ul>\n<li><span data-contrast=\"none\">Controlled shutdown of all servers and network equipment following the documented shutdown procedure<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/li>\n<li><span data-contrast=\"none\">Professional dismantling and labelling of all components according to the teardown documentation<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/li>\n<li><span data-contrast=\"none\">Accompanied or specialist IT transport to the new location<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/li>\n<li><span data-contrast=\"none\">Rebuild, cabling and functional testing at the new location<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p aria-level=\"4\"><strong><i>After the move<\/i>&nbsp;<\/strong><\/p>\n<ul>\n<li><span data-contrast=\"none\">Full validation of all systems by the IT partner before staff are declared operational<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/li>\n<li><span data-contrast=\"none\">Test of email, VoIP, internet access and VPN connectivity for all users<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/li>\n<li><span data-contrast=\"none\">Check of backup systems at the new location to confirm they are running and writing correctly<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/li>\n<li><span data-contrast=\"none\">Walkthrough with employees to inventory any issues not caught during testing<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/li>\n<li><span data-contrast=\"none\">Update of all IT documentation to reflect the new infrastructure layout<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/li>\n<\/ul>\n<p><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/p>\n<h3><span data-contrast=\"none\">Are there specific considerations for moves between Antwerp and Brussels?<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:281,&quot;335559739&quot;:281}\">&nbsp;<\/span><\/h3>\n<p><span data-contrast=\"none\">Relocations between Antwerp and Brussels, or to the Brussels periphery, involve an additional layer of complexity that purely Flemish moves do not.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">&nbsp;<\/span><\/p>\n<p><span data-contrast=\"none\">The transition between Proximus and Telenet&#8217;s Flemish and Brussels networks can affect lead times for a new connection. What works smoothly in Antwerp or Ghent may involve different procedures, different local contractors and different timelines when the destination is in the Brussels region.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">&nbsp;<\/span><\/p>\n<p><span data-contrast=\"none\">Language is also a practical factor that is easy to underestimate: technical contacts at telecom operators are not always available in both Dutch and French. A bilingual IT partner that can manage these conversations in the right language- and follow up correctly when lead times slip- makes a concrete difference to the project timeline.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">&nbsp;<\/span><\/p>\n<p><span data-contrast=\"none\"><strong>ITAF<\/strong> has hands-on experience with relocations across the full B2B corridor between Antwerp and Brussels and manages contact with telecom operators in Dutch, French and English on behalf of clients.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">&nbsp;<\/span><\/p>\n<p><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/p>\n<h3><span data-contrast=\"none\">Can an office relocation also be an opportunity to modernise IT infrastructure?<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:281,&quot;335559739&quot;:281}\">&nbsp;<\/span><\/h3>\n<p><span data-contrast=\"none\">Yes- and in most cases, it is the most practical moment to do so. An office move is the ideal moment to replace outdated infrastructure without the operational disruption that a standalone upgrade would normally cause. When equipment is already dismantled and systems are already temporarily offline, the additional effort to replace rather than reinstall is significantly lower.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">&nbsp;<\/span><\/p>\n<p><span data-contrast=\"none\">Typical improvements that are most cost-efficient to combine with a relocation include:<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">&nbsp;<\/span><\/p>\n<ul>\n<li><span data-contrast=\"none\">Replacement of outdated switches and access points with Wi-Fi 6 equipment for better performance and density<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/li>\n<li><span data-contrast=\"none\">Installation of a structured cabling system (Cat6A) instead of an accumulated patchwork of legacy cabling<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/li>\n<li><span data-contrast=\"none\">Upgrade of the firewall to a next-generation firewall with content filtering and advanced threat protection<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/li>\n<li><span data-contrast=\"none\">Migration of the file server to <a href=\"https:\/\/www.itaf.eu\/en\/services\/microsoft-365\/\" target=\"_blank\" rel=\"noopener\">Microsoft 365<\/a> SharePoint during the move, eliminating the need for local file storage<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/li>\n<li><span data-contrast=\"none\">Installation of a professional patching and containment system in the server room for cleaner cable management and easier future maintenance<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/li>\n<\/ul>\n<p><span data-contrast=\"none\">The combination of relocation and modernisation in a single project is consistently more cost-efficient than running them as two separate projects. The disruption is absorbed once, and the new location starts with a clean, documented infrastructure.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">&nbsp;<\/span><\/p>\n<p><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:0}\">&nbsp;<\/span><\/p>\n<h2><span data-contrast=\"none\">FAQ<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:281,&quot;335559739&quot;:281}\">&nbsp;<\/span><\/h2>\n<p><b><span data-contrast=\"none\">What is an IT relocation?<\/span><\/b><span data-contrast=\"none\"> An IT relocation is the structured process of dismantling, transporting and rebuilding a company&#8217;s IT infrastructure- including servers, network equipment, cabling and telephony- during an office move.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">&nbsp;<\/span><\/p>\n<p><b><span data-contrast=\"none\">Why is an IT relocation a risk for SMBs?<\/span><\/b><span data-contrast=\"none\"> Because the combination of physical disruption, tight timelines and technical complexity creates conditions where mistakes are easy and their impact is high. Data loss, days of downtime and a non-functional network at the new location are all documented outcomes of unplanned IT moves.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">&nbsp;<\/span><\/p>\n<p><b><span data-contrast=\"none\">How far in advance should an IT relocation be planned?<\/span><\/b><span data-contrast=\"none\"> At least 8 weeks. Internet connections from Proximus and Telenet in Belgium require a lead time of 4 to 8 weeks. Documentation, hardware ordering and backup validation also require time that cannot be compressed without risk.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">&nbsp;<\/span><\/p>\n<p><b><span data-contrast=\"none\">How long does the rebuild of a server rack and network take?<\/span><\/b><span data-contrast=\"none\"> For an average SMB environment with one server rack and 20 to 50 users, a full rebuild and validation takes 1 to 2 working days. ITAF plans this so that employees can start work without issues from their first morning at the new location.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">&nbsp;<\/span><\/p>\n<p><b><span data-contrast=\"none\">Can employees work from home during the move?<\/span><\/b><span data-contrast=\"none\"> If the company already uses Microsoft 365 combined with VPN or Azure Virtual Desktop, most employees can work remotely without issues on moving day. Remote access should be tested and confirmed before the move, not assumed.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">&nbsp;<\/span><\/p>\n<p><b><span data-contrast=\"none\">What if the internet connection at the new location is not ready on moving day?<\/span><\/b><span data-contrast=\"none\"> This risk is avoided by ordering the connection at least 8 weeks in advance. If a delay still occurs despite early ordering, temporary 4G\/5G backup connectivity can be provided to keep the business operational while the permanent line is activated.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">&nbsp;<\/span><\/p>\n<p><b><span data-contrast=\"none\">Does ITAF coordinate with the removal company?<\/span><\/b><span data-contrast=\"none\"> ITAF coordinates specifically the IT-related tasks- power, network and data- and aligns the planning with the removal company. The removal company handles furniture and boxes. ITAF handles everything related to infrastructure.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">&nbsp;<\/span><\/p>\n<p><b><span data-contrast=\"none\">Can we replace our servers during the move rather than reinstalling the existing ones?<\/span><\/b><span data-contrast=\"none\"> Yes, and this is often recommended. A combined project- relocation plus hardware upgrade, or relocation plus migration to Microsoft 365- is more cost-efficient than running both projects separately. The downtime and disruption are absorbed once, not twice.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">&nbsp;<\/span><\/p>\n<p><b><span data-contrast=\"none\">Are there specific challenges for moves between Antwerp and Brussels?<\/span><\/b><span data-contrast=\"none\"> Yes. Telecom lead times, network handover between Proximus and Telenet&#8217;s regional networks, and language requirements for technical contacts all add complexity.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">&nbsp;<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>An office IT relocation is the controlled dismantling, transport and rebuild of a company&#8217;s complete IT infrastructure during a move. This includes servers, network equipment, cabling, firewall and telephony. Unlike moving furniture, an IT relocation carries specific risks: servers that are not properly shut down before transport can suffer data damage, and internet connections in [&hellip;]<\/p>\n","protected":false},"author":19,"featured_media":60087,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"ngg_post_thumbnail":0,"footnotes":""},"categories":[92],"tags":[],"class_list":["post-60086","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-it-support"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Office relocation IT checklist: teardown and rebuild of server and network in Belgium - ITAF IT Partner<\/title>\n<meta name=\"description\" content=\"An office IT relocation is the controlled dismantling, transport and rebuild of a company&#039;s complete IT infrastructure during a move\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.itaf.eu\/en\/office-relocation-it-checklist-teardown-and-rebuild-of-server-and-network-in-belgium\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Office relocation IT checklist: teardown and rebuild of server and network in Belgium - ITAF IT Partner\" \/>\n<meta property=\"og:description\" content=\"An office IT relocation is the controlled dismantling, transport and rebuild of a company&#039;s complete IT infrastructure during a move\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.itaf.eu\/en\/office-relocation-it-checklist-teardown-and-rebuild-of-server-and-network-in-belgium\/\" \/>\n<meta property=\"og:site_name\" content=\"ITAF IT Partner\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ITAF.eu\" \/>\n<meta property=\"article:published_time\" content=\"2026-04-22T07:48:41+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.itaf.eu\/wp-content\/uploads\/2026\/04\/Office-Relocation_EN.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1080\" \/>\n\t<meta property=\"og:image:height\" content=\"600\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Ana Bogdanovic\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ITAF_IT_partner\" \/>\n<meta name=\"twitter:site\" content=\"@ITAF_IT_partner\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Ana Bogdanovic\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.itaf.eu\\\/en\\\/office-relocation-it-checklist-teardown-and-rebuild-of-server-and-network-in-belgium\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.itaf.eu\\\/en\\\/office-relocation-it-checklist-teardown-and-rebuild-of-server-and-network-in-belgium\\\/\"},\"author\":{\"name\":\"Ana Bogdanovic\",\"@id\":\"https:\\\/\\\/www.itaf.eu\\\/en\\\/#\\\/schema\\\/person\\\/1e4a0eec822e986f41c456a93e486ce3\"},\"headline\":\"Office relocation IT checklist: teardown and rebuild of server and network in Belgium\",\"datePublished\":\"2026-04-22T07:48:41+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.itaf.eu\\\/en\\\/office-relocation-it-checklist-teardown-and-rebuild-of-server-and-network-in-belgium\\\/\"},\"wordCount\":1859,\"publisher\":{\"@id\":\"https:\\\/\\\/www.itaf.eu\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.itaf.eu\\\/en\\\/office-relocation-it-checklist-teardown-and-rebuild-of-server-and-network-in-belgium\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.itaf.eu\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/Office-Relocation_EN.jpg\",\"articleSection\":[\"IT Support\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.itaf.eu\\\/en\\\/office-relocation-it-checklist-teardown-and-rebuild-of-server-and-network-in-belgium\\\/\",\"url\":\"https:\\\/\\\/www.itaf.eu\\\/en\\\/office-relocation-it-checklist-teardown-and-rebuild-of-server-and-network-in-belgium\\\/\",\"name\":\"Office relocation IT checklist: teardown and rebuild of server and network in Belgium - ITAF IT Partner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.itaf.eu\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.itaf.eu\\\/en\\\/office-relocation-it-checklist-teardown-and-rebuild-of-server-and-network-in-belgium\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.itaf.eu\\\/en\\\/office-relocation-it-checklist-teardown-and-rebuild-of-server-and-network-in-belgium\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.itaf.eu\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/Office-Relocation_EN.jpg\",\"datePublished\":\"2026-04-22T07:48:41+00:00\",\"description\":\"An office IT relocation is the controlled dismantling, transport and rebuild of a company's complete IT infrastructure during a move\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.itaf.eu\\\/en\\\/office-relocation-it-checklist-teardown-and-rebuild-of-server-and-network-in-belgium\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.itaf.eu\\\/en\\\/office-relocation-it-checklist-teardown-and-rebuild-of-server-and-network-in-belgium\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.itaf.eu\\\/en\\\/office-relocation-it-checklist-teardown-and-rebuild-of-server-and-network-in-belgium\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.itaf.eu\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/Office-Relocation_EN.jpg\",\"contentUrl\":\"https:\\\/\\\/www.itaf.eu\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/Office-Relocation_EN.jpg\",\"width\":1080,\"height\":600,\"caption\":\"Office IT relocation\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.itaf.eu\\\/en\\\/office-relocation-it-checklist-teardown-and-rebuild-of-server-and-network-in-belgium\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.itaf.eu\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Office relocation IT checklist: teardown and rebuild of server and network in Belgium\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.itaf.eu\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.itaf.eu\\\/en\\\/\",\"name\":\"ITAF IT Partner\",\"description\":\"Reliable IT support\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.itaf.eu\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.itaf.eu\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.itaf.eu\\\/en\\\/#organization\",\"name\":\"ITAF is een IT partner voor KMO's, grote bedrijven en overheid: IT support, ICT infrastructuur, Cloud oplossingen, Managed IT services en software ontwikkeling\",\"url\":\"https:\\\/\\\/www.itaf.eu\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.itaf.eu\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.itaf.eu\\\/wp-content\\\/uploads\\\/2026\\\/02\\\/ITAF-Geniki_logo_512px-1.webp\",\"contentUrl\":\"https:\\\/\\\/www.itaf.eu\\\/wp-content\\\/uploads\\\/2026\\\/02\\\/ITAF-Geniki_logo_512px-1.webp\",\"width\":512,\"height\":166,\"caption\":\"ITAF is een IT partner voor KMO's, grote bedrijven en overheid: IT support, ICT infrastructuur, Cloud oplossingen, Managed IT services en software ontwikkeling\"},\"image\":{\"@id\":\"https:\\\/\\\/www.itaf.eu\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/ITAF.eu\",\"https:\\\/\\\/x.com\\\/ITAF_IT_partner\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/itaf-eu?trk=tyah&trkInfo=clickedVerticalcompanyidx2-2-7tarId1429703363595tasitaf\",\"https:\\\/\\\/www.youtube.com\\\/@ITAFICTPartner\\\/\",\"https:\\\/\\\/www.instagram.com\\\/itaf.eu\\\/\",\"https:\\\/\\\/www.threads.net\\\/@itaf.eu\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.itaf.eu\\\/en\\\/#\\\/schema\\\/person\\\/1e4a0eec822e986f41c456a93e486ce3\",\"name\":\"Ana Bogdanovic\",\"url\":\"https:\\\/\\\/www.itaf.eu\\\/en\\\/author\\\/ana-bogdanovic\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Office relocation IT checklist: teardown and rebuild of server and network in Belgium - ITAF IT Partner","description":"An office IT relocation is the controlled dismantling, transport and rebuild of a company's complete IT infrastructure during a move","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.itaf.eu\/en\/office-relocation-it-checklist-teardown-and-rebuild-of-server-and-network-in-belgium\/","og_locale":"en_US","og_type":"article","og_title":"Office relocation IT checklist: teardown and rebuild of server and network in Belgium - ITAF IT Partner","og_description":"An office IT relocation is the controlled dismantling, transport and rebuild of a company's complete IT infrastructure during a move","og_url":"https:\/\/www.itaf.eu\/en\/office-relocation-it-checklist-teardown-and-rebuild-of-server-and-network-in-belgium\/","og_site_name":"ITAF IT Partner","article_publisher":"https:\/\/www.facebook.com\/ITAF.eu","article_published_time":"2026-04-22T07:48:41+00:00","og_image":[{"width":1080,"height":600,"url":"https:\/\/www.itaf.eu\/wp-content\/uploads\/2026\/04\/Office-Relocation_EN.jpg","type":"image\/jpeg"}],"author":"Ana Bogdanovic","twitter_card":"summary_large_image","twitter_creator":"@ITAF_IT_partner","twitter_site":"@ITAF_IT_partner","twitter_misc":{"Written by":"Ana Bogdanovic","Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.itaf.eu\/en\/office-relocation-it-checklist-teardown-and-rebuild-of-server-and-network-in-belgium\/#article","isPartOf":{"@id":"https:\/\/www.itaf.eu\/en\/office-relocation-it-checklist-teardown-and-rebuild-of-server-and-network-in-belgium\/"},"author":{"name":"Ana Bogdanovic","@id":"https:\/\/www.itaf.eu\/en\/#\/schema\/person\/1e4a0eec822e986f41c456a93e486ce3"},"headline":"Office relocation IT checklist: teardown and rebuild of server and network in Belgium","datePublished":"2026-04-22T07:48:41+00:00","mainEntityOfPage":{"@id":"https:\/\/www.itaf.eu\/en\/office-relocation-it-checklist-teardown-and-rebuild-of-server-and-network-in-belgium\/"},"wordCount":1859,"publisher":{"@id":"https:\/\/www.itaf.eu\/en\/#organization"},"image":{"@id":"https:\/\/www.itaf.eu\/en\/office-relocation-it-checklist-teardown-and-rebuild-of-server-and-network-in-belgium\/#primaryimage"},"thumbnailUrl":"https:\/\/www.itaf.eu\/wp-content\/uploads\/2026\/04\/Office-Relocation_EN.jpg","articleSection":["IT Support"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.itaf.eu\/en\/office-relocation-it-checklist-teardown-and-rebuild-of-server-and-network-in-belgium\/","url":"https:\/\/www.itaf.eu\/en\/office-relocation-it-checklist-teardown-and-rebuild-of-server-and-network-in-belgium\/","name":"Office relocation IT checklist: teardown and rebuild of server and network in Belgium - ITAF IT Partner","isPartOf":{"@id":"https:\/\/www.itaf.eu\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.itaf.eu\/en\/office-relocation-it-checklist-teardown-and-rebuild-of-server-and-network-in-belgium\/#primaryimage"},"image":{"@id":"https:\/\/www.itaf.eu\/en\/office-relocation-it-checklist-teardown-and-rebuild-of-server-and-network-in-belgium\/#primaryimage"},"thumbnailUrl":"https:\/\/www.itaf.eu\/wp-content\/uploads\/2026\/04\/Office-Relocation_EN.jpg","datePublished":"2026-04-22T07:48:41+00:00","description":"An office IT relocation is the controlled dismantling, transport and rebuild of a company's complete IT infrastructure during a move","breadcrumb":{"@id":"https:\/\/www.itaf.eu\/en\/office-relocation-it-checklist-teardown-and-rebuild-of-server-and-network-in-belgium\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.itaf.eu\/en\/office-relocation-it-checklist-teardown-and-rebuild-of-server-and-network-in-belgium\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.itaf.eu\/en\/office-relocation-it-checklist-teardown-and-rebuild-of-server-and-network-in-belgium\/#primaryimage","url":"https:\/\/www.itaf.eu\/wp-content\/uploads\/2026\/04\/Office-Relocation_EN.jpg","contentUrl":"https:\/\/www.itaf.eu\/wp-content\/uploads\/2026\/04\/Office-Relocation_EN.jpg","width":1080,"height":600,"caption":"Office IT relocation"},{"@type":"BreadcrumbList","@id":"https:\/\/www.itaf.eu\/en\/office-relocation-it-checklist-teardown-and-rebuild-of-server-and-network-in-belgium\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.itaf.eu\/en\/"},{"@type":"ListItem","position":2,"name":"Office relocation IT checklist: teardown and rebuild of server and network in Belgium"}]},{"@type":"WebSite","@id":"https:\/\/www.itaf.eu\/en\/#website","url":"https:\/\/www.itaf.eu\/en\/","name":"ITAF IT Partner","description":"Reliable IT support","publisher":{"@id":"https:\/\/www.itaf.eu\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.itaf.eu\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.itaf.eu\/en\/#organization","name":"ITAF is een IT partner voor KMO's, grote bedrijven en overheid: IT support, ICT infrastructuur, Cloud oplossingen, Managed IT services en software ontwikkeling","url":"https:\/\/www.itaf.eu\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.itaf.eu\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.itaf.eu\/wp-content\/uploads\/2026\/02\/ITAF-Geniki_logo_512px-1.webp","contentUrl":"https:\/\/www.itaf.eu\/wp-content\/uploads\/2026\/02\/ITAF-Geniki_logo_512px-1.webp","width":512,"height":166,"caption":"ITAF is een IT partner voor KMO's, grote bedrijven en overheid: IT support, ICT infrastructuur, Cloud oplossingen, Managed IT services en software ontwikkeling"},"image":{"@id":"https:\/\/www.itaf.eu\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ITAF.eu","https:\/\/x.com\/ITAF_IT_partner","https:\/\/www.linkedin.com\/company\/itaf-eu?trk=tyah&trkInfo=clickedVerticalcompanyidx2-2-7tarId1429703363595tasitaf","https:\/\/www.youtube.com\/@ITAFICTPartner\/","https:\/\/www.instagram.com\/itaf.eu\/","https:\/\/www.threads.net\/@itaf.eu"]},{"@type":"Person","@id":"https:\/\/www.itaf.eu\/en\/#\/schema\/person\/1e4a0eec822e986f41c456a93e486ce3","name":"Ana Bogdanovic","url":"https:\/\/www.itaf.eu\/en\/author\/ana-bogdanovic\/"}]}},"_links":{"self":[{"href":"https:\/\/www.itaf.eu\/en\/wp-json\/wp\/v2\/posts\/60086","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.itaf.eu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.itaf.eu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.itaf.eu\/en\/wp-json\/wp\/v2\/users\/19"}],"replies":[{"embeddable":true,"href":"https:\/\/www.itaf.eu\/en\/wp-json\/wp\/v2\/comments?post=60086"}],"version-history":[{"count":2,"href":"https:\/\/www.itaf.eu\/en\/wp-json\/wp\/v2\/posts\/60086\/revisions"}],"predecessor-version":[{"id":60262,"href":"https:\/\/www.itaf.eu\/en\/wp-json\/wp\/v2\/posts\/60086\/revisions\/60262"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.itaf.eu\/en\/wp-json\/wp\/v2\/media\/60087"}],"wp:attachment":[{"href":"https:\/\/www.itaf.eu\/en\/wp-json\/wp\/v2\/media?parent=60086"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.itaf.eu\/en\/wp-json\/wp\/v2\/categories?post=60086"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.itaf.eu\/en\/wp-json\/wp\/v2\/tags?post=60086"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}